|
CRA Funded Projects Swinton Avenue Traffic Calming
Architect/Engineer: TBD Contact: Randal Krejcarek, City Engineer, 561-243-7030 Project Description: The Downtown Plan identified the Swinton Avenue intersection as a major impediment to achieving the objective of unifying East and West Atlantic into a "seamless" downtown corridor. The width of the intersection and the amount of traffic it experiences creates difficulties for pedestrians wishing to cross from one side to the other. The dramatic increase in the number of pedestrians in the downtown area has led to a greater potential for pedestrian/vehicular conflicts. The Downtown Plan proposed two possible modifications to this intersection in order to improve pedestrian safety:
|